High volume pressure tapping saddle tee for gas pipe

High volume pressure tapping saddle tee for gas pipe
High volume pressure tapping saddle tee for gas pipe
High volume pressure tapping saddle tee for gas pipe
High volume pressure tapping saddle tee for gas pipe
High volume pressure tapping saddle tee for gas pipe
Name
Tapping Saddle Tee
Material
HDPE
Pressure Rating
SDR11,17,26
Place of Origin
China
Colors
Black
Payment items
T/T L/C
Port
Qingdao
Payment
30% ADVANCE PAYMENT AND THE 70% BALANCE PAYMENT BEFORE THE SHIPEMNT
Electrofusion saddle products are used to fasten pipes, especially for large-diameter pipes. The methods of injection molding, sucking and welding are adopted in the electrofusion saddle product manufacturing process. These products have excellent weldability and high strength, enabling the two or more tubes to be connected without any gap between them after welding; meanwhile with good anti-corrosion features, long life span and low maintenance cost.

tapping-tee-gas.png

Operation logic of electrofusion pressure saddle tee fittings

The method of injection molding of electrofusion saddle products is to directly inject the product into a semicircle. Since the structure of electrofusion saddle products is semicircular, a jacket must be used to fasten the pipe before welding. An electrofusion saddle type product that causes the pipe to deform under the action of the clamping force to match the structural deformation.

The operation process of PE electrofusion pressure saddle tee fittings

1. Preparation before welding: the same as the welding of electrofusion socket fittings

2. Scribe, and mark the welding area on the pipe

3. Clean the welding surface, and scrape the welding surface in the scribed area by about 0.2MM to remove the oxide layer, the scraping area should be larger than the oxide layer

4. The pipe fittings shall be installed according to the method provided by the manufacturer to ensure no gap between the welding surface of the pipe fitting and the pipe.

5. Welding data input and welding: the same as that of electrofusion socket fittings

6. Natural cooling, the street should be under pressure during the cooling process, and the cooling time of the saddle tee should be more than 60min or operate according to the product operating instructions.

7. Blocking, according to the instructions of the pipe fittings.

tapping-tee-gas-pipe.png

The electric fusion saddle pressure tee fittings precautions

(1) Before the electric fusion saddle connection, the dirt on the pipe connection area should be cleaned and scraped.

(2) The connection area between fittings and pipes should be cleaned with a suitable cleaning agent.

(3) Appropriate clamps should be used to fix the pipe fittings and pipes with appropriate clamping force according to the requirements of the pipe fittings.

(4) The welding parameters of the electrofusion connection should meet the requirements of the pipe and pipe fittings manufacturers.

(5) Before reaching the specified cooling time, the clamp should not be removed, and no external force should be applied to the joint.

(6) After the electric fusion saddle connection is completed, the appearance inspection should be carried out, and the following requirements should be met, otherwise, rework should be carried out until the review is qualified.

The main operation steps of the tapping tee hole with pressure

The purpose of opening under pressure is to add construction techniques such as bypass and tee to the pipeline under the condition of non-stop production and pressure. First, weld short flange joints on the pipeline, and then install a gate valve with a suitable pressure level on the flange. The valve is required to be concentric. Diameter; fully open the valve after it is in place, and then connect the drilling rig with bolts to open the hole according to the operating rules. Close the valve and remove the rig to connect the side branch.

Inspection work after electrofusion pressure saddle tee connection

A. When welding is completed, the pipe wall should not collapse, and no molten material should flow out of any position in the pipe;

B. After the welding is completed, the observation hole meets the requirements put forward by the manufacturer.

C/Electrofusion saddle connection drilling should be done after reaching the specified cooling time and passing the county appearance inspection. Special tools should be used for opening holes. After the electrofusion saddle bypass hole is opened, the tool should be restored to the position before the hole, and the top cover should be tightened or sealed with an end cap.

tapping-tee-fitting.png


Send a Message

If you want to ask anything just fill in the form below and send us.

Write a review

// Our Pipe //

Featured Pipe Products

What is the Full Form of HDPE Pipe? Exploring the Benefits of HDPE Piping
What is the Full Form of HDPE Pipe? Exploring the Benefits of HDPE Piping

If you’ve been researching pipes, then you’ve probably come across the term HDPE pipe. But what is t...

1.4/1.5 in 40mm* SDR17* 500ft PE100 gas pipe coil price
1.4/1.5 in 40mm* SDR17* 500ft PE100 gas pipe coil price

The 1.4/1.5 inch 40mm SDR17 500ft PE100 gas pipe coil is a high-quality pipeline solution for the tr...

1.2in 32mm* SDR17* 500ft HDPE gas pipe coil price
1.2in 32mm* SDR17* 500ft HDPE gas pipe coil price

High-Density Polyethylene (HDPE) gas pipes are becoming increasingly popular in the pipeline industr...

25mm 1in.* SDR17* 500ft PE100 gas pipe coil price
25mm 1in.* SDR17* 500ft PE100 gas pipe coil price

The 25mm 1in.* SDR17* 500ft PE100 gas pipe coil is a high-density polyethylene (HDPE) piping solutio...

// Our Pipe //

New Fusion Machine

Hot Melt Plastic Welding Machine in Nepal
Hot Melt Plastic Welding Machine in Nepal

Plastic welding machines are becoming increasingly popular in Nepal due to the growing demand for du...

PPR Welder Machine in India Comprehensive Guide
PPR Welder Machine in India Comprehensive Guide

Are you searching for the perfect PPR welder machine to add to your workshop? Purchasing the right w...

Plastic pipe welding machine price in pakistan
Plastic pipe welding machine price in pakistan

If you are from Pakistan and are ready to understand the performance and price of Plastic pipe weldi...

Plumber butt fusion welding tools 2in' to 4in' machine price list
Plumber butt fusion welding tools 2in' to 4in' machine price list

The manual butt fusion welding machine is used to weld the inner and outer ends of galvanized pipes....

// Our Pipe //

New Pipe Products

2 inch plastic water pipe roll
2 inch plastic water pipe roll

A 2-inch plastic water pipe roll refers to a type of flexible tubing made from plastic, typically hi...

PERT Ⅱ Heat Resistant Insulation Pipe
PERT Ⅱ Heat Resistant Insulation Pipe

Polyurethane prefabricated directly buried insulation pipe, full name: high-density polyethylene out...

Underfloor Heating Pipes PERT Pipe
Underfloor Heating Pipes PERT Pipe

Underfloor Heating Pipes in stock at The Underfloor Heating Store. Multifunctional, reliable underfl...

HDPE Cross Pipe Fittings
HDPE Cross Pipe Fittings

To find the Versatility of HDPE Cross Pipe Fittings. Engineered for precise connections, these fitti...